AXIOM SESSION RESULTS LOG Timestamp: March 04, 2026 15:31 CET RESULTS REVIEWED AND CREDIT AWARDED - Latest validation pass reviewed 25 newly completed uncredited exp_% results. - Sanitized numeric payload matches: 0/25, so quality scoring could not be executed. - Credit awarded this pass: 0 total (safety cap check passed). - Summary by experiment type: pending-scoring completions across active experiment families due to sanitized assimilation gap. STUCK/BROKEN TASK CLEANUP - Dead-host running >12h aborts: 0. - Hard-ceiling running >48h aborts: 0. - No additional broken-queue aborts triggered in the latest pass. - No new script-crash signature (outcome=3) detected in the last 24h. NEW EXPERIMENTS DESIGNED (WITH NOVELTY CHECK) 1. metapop_allee_corridor_hysteresis (ecology / metapopulation dynamics) - Hypothesis: fatigue and recovery in adaptive corridor control create a re-entrant trigger-threshold optimum under Allee-risk climate stress. - Novelty check summary: literature supports Allee thresholds and connectivity-synchrony risk; no direct prior match found for fatigue-governed adaptive corridor threshold reversal mapping. 2. kuramoto_islanding_fatigue_reclosure (power-systems nonlinear dynamics) - Hypothesis: delayed adaptive islanding with fatigue/reclosure hysteresis yields re-entrant resilience versus trigger threshold. - Novelty check summary: prior work covers swing/Kuramoto stability, intentional islanding, and delay effects; no direct prior match found for fatigue + delayed-reclosure threshold-reversal mapping. 3. cstr_poison_purge_reentrance (chemical reactor dynamics) - Hypothesis: stochastic feed disturbance plus fatigue-limited purge control creates a re-entrant poison-trigger optimum for net productivity. - Novelty check summary: catalyst deactivation/regeneration and adaptive CSTR control are established; no direct prior match found for fatigue-limited adaptive purge threshold reversal under stochastic feed. DEPLOYMENT SNAPSHOT (THIS SESSION) - CPU and GPU deployment passes executed with mandatory prechecks and per-host hard-cap enforcement. - GPU checkpoint completed with active top-up deployments across GPU-aware scripts. - Backlog remained within hard cap throughout deployment cycles. KEY SCIENTIFIC FINDINGS 1. No new finding was promotable this session because reviewed completions had no corresponding sanitized numeric files (0/25 in latest validation pass). 2. Scientific conclusions remain unchanged from previously confirmed findings until sanitized assimilation resumes. 3. Previously confirmed interaction findings (WD timing/label-smoothing/noise/imbalance families) remain supported; this session produced no contradictory validated evidence. OPERATIONAL NOTE - Sanitized assimilation appears paused since March 4, 2026 11:37 CET, which is currently the gating factor for new quality-scored validation and credit.