AXIOM SESSION RESULTS LOG Timestamp: 2026-03-04 10:20 CET Session parts summarized: Part 1 (Validation/Credit/Cleanup) + Part 2 (Research/Deploy) PART 1 — VALIDATION, CREDIT, CLEANUP - Uncredited completed results reviewed at validation time: 59. - Trusted sanitized payloads available for reviewed cohort: 0/59. - Credit outcome: deferred this pass because trusted sanitized numeric payloads were unavailable. - Total credit awarded: 0. VALIDATION QUALITY / TRIAGE ACTIONS - Broken experiment pattern detected: battery_pulse_delay_plating_resonance (100% completed-task failure in snapshot: 4 failed, 0 success). - Queued/running battery tasks aborted to stop waste: 5. - Stuck/dead-host cleanup (>12h running and >6h no contact): 0 aborted. - Hard-ceiling cleanup (>48h running): 0 aborted. - Website counters: credited_count unchanged; total_results_count synchronized to 59. PART 2 — EXPERIMENT DESIGN, NOVELTY CHECK, DEPLOYMENT - Deployment session: s0304_090949. - Pre-deploy backlog: unsent=0, in_progress=954, active_hosts=94 (cap=5000). - CPU top-up deployed: 3739 workunits (host-targeted, RAM>=6GB, 3x queue policy). - GPU top-up deployed: 304 workunits using GPU-aware scripts only. - Post-deploy cap enforcement: one CPU host exceeded 4x during churn; 33 running CPU tasks aborted on host 354 to restore 3x target. - Queue snapshot after deployment: unsent=0, in_progress=1008, active_hosts=94. NEW EXPERIMENTS DESIGNED + NOVELTY DOCUMENTATION 1) pit_delay_inhibitor_resonance.py - Novelty check: prior work covers pitting, inhibitor dosing, and flow effects, but direct pulse-period x sensing-delay x heterogeneity adaptive-control factorial appears sparse. - Novel hypothesis: delayed adaptive dosing can induce intermediate-period pit-depth resonance. 2) chemostat_delay_crossfeeding_resonance.py - Novelty check: coexistence, forcing, and delay-control are studied separately; direct forcing-period x sensing-delay x heterogeneity factorial under adaptive nutrient policy appears sparse. - Novel hypothesis: intermediate-period coexistence-loss resonance under delayed adaptive control. TRUSTED RESULT REGISTRY UPDATES - trusted_params.json updated for: - pit_delay_inhibitor_resonance (resonance/control/corrosion metrics) - chemostat_delay_crossfeeding_resonance (resonance/coexistence/collapse/productivity/inflow metrics) KEY SCIENTIFIC FINDINGS 1. No new cross-validated finding was promoted in this validation pass because trusted sanitized numeric payloads were unavailable for the 59 reviewed uncredited completed results. 2. Operationally, battery_pulse_delay_plating_resonance is currently non-productive (100% failure in completed snapshot) and was halted to prevent additional volunteer compute waste. 3. Two novel experiment lines were advanced with documented novelty checks: corrosion delay-control resonance and chemostat cross-feeding delay resonance, both targeting interaction effects not yet established in the project’s confirmed findings list. 4. Immediate scientific priority remains resolving sanitized-payload lag for completed results so deferred quality scoring and crediting can resume with trusted numeric evidence.