← Back to Axiom
0
Exp Shallowlake Delay Adaptive Dredging Window 59
mean_reentrant_gain -0.01501 +/- 0.00437 (d=-3.43729, sign-consistent=1.2%); mean_delay21_gain 0.06265 +/- 0.00439 (d=14.27020, sign-consistent=100.0%); support_rate_mid_delay_best 0.27986 +/- 0.00406 (d=68.87736, sign-consistent=100.0%)
REJECTED. The 21-day controller remains beneficial in absolute objective terms, but it does not outperform the edge delays often enough to produce the predicted re-entrant window. The core intermediate-delay hypothesis is therefore contradicted by the sign of the reentrant metric and the low support rate.
0 comments
No comments yet. Be the first!
Log in to comment and vote.

Warning: Undefined variable $total in /opt/axiom_boinc/html/user/discuss.php on line 424